← All industries Long-life infrastructure

Water & Geothermal

Wells that have to last decades.

Water and geothermal wells run for decades. The screens at the heart of them are expected to deliver consistent flow, year after year, with minimal maintenance access. Quality at manufacturing is the only way to deliver this.

Context

Where it matters

Drinking water, agricultural irrigation, geothermal heat pumps and deep geothermal projects all rely on wedge wire and wire wrap screens. These wells are hard to revisit, often subsidized by long-term contracts, and the screen is the single most critical wear component.

Challenge

Field reality

Sediment intrusion shortens well life. Plugging reduces flow and forces costly interventions. Screen specifications drift between batches, with no objective way to compare suppliers.

Solution

CTRL+ in water

Pre-deployment optical inspection of every screen ensures the slot opening matches the well design. Production lines offer documented quality as a differentiator. Operators avoid the cost of premature well intervention.

Applications

Where CTRL+ fits

  • Drinking water wells
  • Geothermal heat pump loops
  • Deep geothermal projects
  • Agricultural and industrial water capture
  • Mineral water and aquifer protection

Discuss a water/geothermal project

Our sales engineering team typically replies the same day.

Contact us